NASA budget: WFIRST mission is cancelled while ISS time is marked – but SLS is thrown a lifeline

by | Feb 13, 2018 | NASA, Seradata News

NASA’s acting administrator, Robert Lightfoot, revealed in a speech at NASA Marshall Spaceflight Center at Huntsville, Alabama, that NASA’s budget had received a US$300 million increase to its original request, raising it to US$19.9 billion for Fiscal Year 2019 (FY2019).

But there were some shocks. US State funding for the International Space Station (ISS) is to cease in 2025 – effectively meaning the end of the station unless commercial funding can be found. Savings in running and transportation costs for NASA will amount to about US$3 billion a year. A NASA grant of $150 million per year over the next five years is being made available for commercial companies to help to continue to run the ISS or, more likely, to develop a smaller Low Earth Orbit (LEO) space station.

Having already cancelled the unpopular Asteroid Redirect Mission (ARM), the plan instigated by the Trump administration also cut a keynote science programme, the US$3.2 billion Wide-Field Infrared Survey Telescope (WFIRST) observatory. Instead there is a renewed emphasis on lunar exploration as a route to proving out technologies for an eventual human mission to Mars.

NASA is officially committing to the construction of an orbiting space station around the Moon called Lunar Orbital Platform – Gateway, the first element of which will be the power and propulsion module. US$504 million of the FY2019 budget is being allocated to the platform design. The platform will be used as a base for robotic landings on the Moon, before eventual human astronaut landings some time in the late 2020s – after Donald Trump leaves office should he get a second term. The 7.5 metric ton Power and Propulsion module is expected to make extensive use of the solar electric thruster technology that was being designed for the cancelled ARM.

Although threatened by newer (and cheaper to operate) commercial heavy-lift rockets, such as the Falcon Heavy and BFR and the New Glenn rocket series, the NASA SLS heavy-lift rocket got the fillip it needed when the joint SLS/Orion programme had US$3.7 billion allocated to it for FY2019.

Nevertheless, long-range human spaceflight still seems far off. The maiden flight of the SLS mission EM-1 will be a one-off flight of the Block 1 ICPS version of the SLS. It will carry the Orion capsule and service module as an unmanned test flight. This was supposed to have been in 2018 but will now take place in 2020. There will then be a hiatus in human exploration flight until 2023 when EM-2 is scheduled. This manned flight will be on the SLS Block 1B using the EUS (Exploration Upper Stage) currently being developed. The power and propulsion module will be launched a year earlier on a commercial flight, although SLS is still officially in the running.

While losing its WFIRST laboratory, NASA’s science budget has been set at US$5.9 billion covering Earth and planetary science as well as astrophysics. Despite cancellation of the full-blown ARM, there is a budget allocation of US90 million for the Double Asteroid Redirection Test, which will research deflection techniques in case any asteroid threatens Earth.

 

About Seradata

Seradata produce the renowned SpaceTrak Launch & Satellite Database. Trusted by 100 of the world’s leading Space organisations, SpaceTrak is a fully queryable database used for market analysis, failure/risk assessment, spectrum analysis and space situational awareness (SSA).

For more information go to www.seradata.com/spacetrak

Related Articles

NASA paints a brave face on SLS engine test failure (Updated)

NASA might have said that it wanted a minimum of 250 seconds' worth of engine firing plus gimbal movements to Read more

Despite anti-democratic attempt to storm its government, the USA gets a new President – with Senate power which is bad news for SLS

After politically traumatic events in Washington DC, the inauguration of President elect Joe Biden and his Vice President elect Kamala Read more

Bridenstine notes public-private partnerships in NASA push to develop crewed lunar landers

At the 35th Space Symposium in Colorado on 9 April, NASA Administrator Jim Bridenstine put some meat on the bare Read more

Pence commits NASA to human return to the Moon before 2024 as it goes cold on further development of SLS

The Trump Administration has signalled a change of space policy on a human return to the Moon. Addressing the National Space Read more

Analysis: In the Great Space Race China retakes lead for human lunar return but USA is still favourite for Mars

While the original space race between superpowers - the USA and Soviet Union during the 1960s - was effectively ended Read more

Elon Musk repositions SpaceX’s Mars transportation system as “Jack of all Trades” while Lockheed Martin fills its Mars excursion gap

SpaceX leader Elon Musk has explained how his vision for travel to Mars encompasses uses in low Earth orbit and Read more

NASA drops a clanger as it damages SLS tank dome “beyond repair”

The credibility of NASA’s uber-expensive heavy-lift rocket programme, SLS, is in jeopardy. This follows NASA’s admission that its first flight would be Read more

Bookmaker was right: Orion will be next US crewed capsule if first SLS launch carries humans…and Musk does not do it first

A couple of years ago a UK/Irish bookmaker (Paddy Power) was offering odds on which US spacecraft would carry the next humans Read more

Cookies & Privacy

Click here to read about use of cookies on the website

Categories

Archives